DESIGN FOR THE CONSTRUCTION OF LEGS 10 IN THE BUBANJ POTOK LOOP (E-70/E-75, BELGRADE BYPASS)

The economic and commercial zone (ECZ) is planned at the intersection of two highways, i.e. two branches of Corridor 10: “Belgrade – Niš” and “Obilaznice Beograd”.

The planned traffic network within the Detailed Regulation Plan envisages the construction of Branch 10 within the Interchange “Bubanj Potok” in order to enable the exit of vehicles from the direction of the ring road towards Belgrade and at the same time provide access to the area in question from both directions of the E-75 highway, the Ring Road and node Bubanj potok. The “Leg 10” in question represents an essential infrastructure connection between Belgrade neighborhoods and the ECZ, which are located along the Belgrade Ring Road and in the city center.